I-295 East Beltway landscaping project from SR 9B to JTB
Sector: Water Supply and Storage • Location: Jacksonville, Florida, United States of America
Source: Florida Department of Transportation (FDOT)
Arazoza Brothers Corporation has been selected to complete this landscaping project along I-295 from State Road 9B to J.T Butler Boulevard (State Road 202). The corridor project consists of landscaping and irrigation with a focus upon the SR 9B, Baymeadows Road and Gate Parkway interchanges. Plantings are expected to include, but not limited to Loblolly Bay (Gordonia lasianthus), Eagleston Holly (
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Arazoza Brothers Corporation has been selected to complete this landscaping project along I-295 from State Road 9B to J.T Butler Boulevard (State Road 202). The corridor project consists of landscaping and irrigation with a focus upon the SR 9B, Baymeadows Road and Gate Parkway interchanges. Plantings are expected to include, but not limited to Loblolly Bay (Gordonia lasianthus), Eagleston Holly (Ilex x attenuate ‘Eagleston’), Southern Red Cedar (Juniperus silicicola), Muskogee Crape Myrtle (Lagerstroemia x ‘Muskogee’), Sweetgum (Liquidambar styraciflua), Bracken’s Brown Beauty Magnolia (Magnolia grandiflora ‘Bracken’s Brown Beauty’), Sweetbay Magnolia (Magnolia virginiana), Slash Pine (Pinus elliottii), Southern Live Oak (Quercus virginiana), Sabal Palm (Sabal palmetto), Bald Cypress (Taxodium distichum), Winged Elm (Ulmus alata) and Argentine Bahia Sod (Paspalum notatum). A two-year establishment period is included in this landscaping project. Traffic will be maintained in accordance with FDOT design standards throughout the project. No single lane closures will take place from 6 a.m. to 9 p.m. Monday through Thursday and no double lane closures will take place from 5 a.m. to 10 p.m. Monday through Thursday. Additionally, no lane closures will take place from 6 a.m. Friday through 9 p.m. Sunday. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
