logo

I-295 From Heckscher Drive to the Dames Point Bridge Resurfacing

Sector: Bridge • Location: Jacksonville, Florida, United States of America

Source: Florida Department of Transportation (FDOT)

Project
Active

A resurfacing and roadway improvement project on I-295 from south of the Dames Point Bridge to north of the Heckscher Drive (State Road 105) intersection began Monday, September 26. The project includes milling and resurfacing, guardrail improvements, restriping and new highway signage. In addition, the asphalt sections of the Dames Point Bridge will be resurfaced and the bridge joints replaced. D

Project Information FAQ

Project Information

5 Q
The project “I-295 From Heckscher Drive to the Dames Point Bridge Resurfacing” is an infrastructure initiative in the Bridge sector, located in Jacksonville, Florida, United States of America. Taiyo aggregates data on it from Florida Department of Transportation (FDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

A resurfacing and roadway improvement project on I-295 from south of the Dames Point Bridge to north of the Heckscher Drive (State Road 105) intersection began Monday, September 26. The project includes milling and resurfacing, guardrail improvements, restriping and new highway signage. In addition, the asphalt sections of the Dames Point Bridge will be resurfaced and the bridge joints replaced. Drivers should expect nighttime and overnight lane closures during construction. Lane closures will not be scheduled during peak travel times or on holidays or special events. Preferred Materials, Inc. is the contractor for the $12 million project. It is scheduled for completion in fall 2023, weather and unforeseen circumstances permitting.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data