logo

I-295 from New Berlin to Pulaski Road Resurfacing Project

Sector: Car parking • Location: Jacksonville, Florida, United States of America

Source: Florida Department of Transportation (FDOT)

Project
Active

Preferred Materials was selected to complete the $16.1 million project, which includes milling and resurfacing of I-295 from Pulaski Road to New Berlin Road. The improvements also include resurfacing of Pulaski Road and Alta Drive within the limited access right of way and all ramps at those interchanges. The project also consists of lighting and ITS upgrades and drainage improvements at several l

Project Information FAQ

Project Information

5 Q
The project “I-295 from New Berlin to Pulaski Road Resurfacing Project” is an infrastructure initiative in the Car parking sector, located in Jacksonville, Florida, United States of America. Taiyo aggregates data on it from Florida Department of Transportation (FDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Preferred Materials was selected to complete the $16.1 million project, which includes milling and resurfacing of I-295 from Pulaski Road to New Berlin Road. The improvements also include resurfacing of Pulaski Road and Alta Drive within the limited access right of way and all ramps at those interchanges. The project also consists of lighting and ITS upgrades and drainage improvements at several locations and a new sidewalk along Alta Drive. During construction, the public is encouraged to follow detour signs and use caution in the area. Single or ramp lane closures are not allowed anywhere along the project from 6 a.m. to 8 p.m. Monday through Friday, and no double lane closures or detours are allowed anywhere along the project from 5 a.m. to 9 p.m. Monday through Friday.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data