logo

I-295 from the Dames Point Bridge to Monument Road Resurfacing Project

Sector: Bridge • Location: Jacksonville, Florida, United States of America

Source: Florida Department of Transportation (FDOT)

Project
Active

Hubbard Construction Company has been selected to complete this milling and resurfacing project from the south end of the Dames Point Bridge to Monument Road. In addition to milling and resurfacing, the project will include upgrades to signage and lighting. Traffic will be maintained in accordance with FDOT design standards throughout the project. Lane closure restrictions for I-295, SR 113/Souths

Project Information FAQ

Project Information

5 Q
The project “I-295 from the Dames Point Bridge to Monument Road Resurfacing Project” is an infrastructure initiative in the Bridge sector, located in Jacksonville, Florida, United States of America. Taiyo aggregates data on it from Florida Department of Transportation (FDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Hubbard Construction Company has been selected to complete this milling and resurfacing project from the south end of the Dames Point Bridge to Monument Road. In addition to milling and resurfacing, the project will include upgrades to signage and lighting. Traffic will be maintained in accordance with FDOT design standards throughout the project. Lane closure restrictions for I-295, SR 113/Southside Connector and frontage roads include no double lane closures or detours between 5 a.m. and 10 p.m. and no single lane closures Monday through Thursday from 6 a.m. to 9 p.m., Fridays from 6 a.m. to 10 p.m., Saturdays from 9 a.m. until 10 p.m. and Sundays from 9 a.m. to 8 p.m.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data