I-30 Bridge Improvements
Sector: Raw Materials • Location: Arlington, Texas, United States of America
Source: Dodge USA
Scope - The intent of this solicitation is to improve the seven bridges in Arlington over I-30 (Fielder Road, Davis Drive, Cooper Street, Center Street, Collins Street, AT&T Way/Baird Farm Road, and Ballpark Way). This work includes furnishing and installing bridge lettering, power washing, painting, and upgrading chain link fences
- Status
- Closed
- Sector
- Raw Materials, Bridge, Road, Power Generation (CCGT), Government, Commercial
- Location
- Arlington, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about I-30 Bridge Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope - The intent of this solicitation is to improve the seven bridges in Arlington over I-30 (Fielder Road, Davis Drive, Cooper Street, Center Street, Collins Street, AT&T Way/Baird Farm Road, and Ballpark Way). This work includes furnishing and installing bridge lettering, power washing, painting, and upgrading chain link fences |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Arlington |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Bridge, Road, Power Generation (CCGT), Government, Commercial |
Article published date | 2024-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
