I-30 Canyon Improvement Project
Sector: Rail • Location: Dallas, Texas, USA
Source: Patch
The project involves reconfiguring the existing I-30 corridor between the I-35E and I-45 interchanges in Dallas. Key improvements include reconstruction and widening of the I-30 main lanes from six to 12, increasing the weave lengths between interchanges, redesign of cross streets for safer bike and pedestrian accommodations, rail crossing improvements, and potential decking opportunities.
- Status
- Under Construction
- Sector
- Rail, Road
- Location
- Dallas, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Patch
ConstructChat
Ask ConstructChat about I-30 Canyon Improvement Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves reconfiguring the existing I-30 corridor between the I-35E and I-45 interchanges in Dallas. Key improvements include reconstruction and widening of the I-30 main lanes from six to 12, increasing the weave lengths between interchanges, redesign of cross streets for safer bike and pedestrian accommodations, rail crossing improvements, and potential decking opportunities. |
Original sector | Transportation |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Dallas |
Source
Source | Patch |
URL |
More Details
Record type | Project |
Sector | Rail, Road |
Article published date | 2026-05-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
