logo

I-30 Hunt County West from FM 2642 to SH 34

Sector: Road • Location: United States of America (USA)

Source: Texas Department of Transportation (TxDOT)

Project
Implementation

TxDOT's Paris District is proposing improvements to I-30, including reconstruction and widening of the four-lane freeway to six lanes, reconfiguration of access ramps, and incorporation of one-way frontage roads from FM 2642 to SH 34 in Hunt County, Texas. Hunt County is experiencing rapid growth and the I-30 corridor is a vital part of the mobility in the area. The proposed conversion of the one-

Project Information FAQ

Project Information

4 Q
The project “I-30 Hunt County West from FM 2642 to SH 34” is an infrastructure initiative in the Road sector, located in United States of America (USA). Taiyo aggregates data on it from Texas Department of Transportation (TxDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

implementation

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

TxDOT's Paris District is proposing improvements to I-30, including reconstruction and widening of the four-lane freeway to six lanes, reconfiguration of access ramps, and incorporation of one-way frontage roads from FM 2642 to SH 34 in Hunt County, Texas. Hunt County is experiencing rapid growth and the I-30 corridor is a vital part of the mobility in the area. The proposed conversion of the one-way frontage road, as well as the added capacity of the freeway within the 12.34-mile project, are needed to improve safety as well as congestion between FM 2642 and SH 34. Proposed improvements to CR 2511/CR 2646, FM 1565, FM 36, FM 1903, and FM 1570 interchanges with I-30 would also enhance connectivity. These solutions are intended to enhance corridor safety by making improvements to decrease the likelihood of crashes and improve localized intersection and interchange safety, mobility and operations. Based on the traffic analysis, the average annual traffic volume is anticipated to increase by around 35 percent and 50 percent in the years 2045 and 2055, respectively throughout this project alignment.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data