logo

I-35 Capital Express Central Project (Drainage tunnel and pump station)

Under construction · Texas · Last reported Jul 2026

Source: Community Impact

Project
Under Construction

Two 22-foot-wide drainage tunnels will run 6.5 miles along I-35 from 45th St. to Cesar Chavez St., then east to near US 183 by Lady Bird Lake, with a pump station and access shafts to improve stormwater management.

Status
Under Construction
Sector
Mass Transit, Tunnel
Location
Austin, Texas, United States of America
Updated
22 Jul 2026
Source
Community Impact

ConstructChat

Ask ConstructChat about I-35 Capital Express Central Project (Drainage tunnel and pump station)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “I-35 Capital Express Central Project (Drainage tunnel and pump station)” is an infrastructure initiative in the Mass Transit sector, located in Austin, Texas, USA. Taiyo aggregates data on it from Community Impact.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Two 22-foot-wide drainage tunnels will run 6.5 miles along I-35 from 45th St. to Cesar Chavez St., then east to near US 183 by Lady Bird Lake, with a pump station and access shafts to improve stormwater management.

Original sector

Transportation

Budget

Location

Country

United States of America (USA)

State

Texas

City

Austin

Source

Source

Community Impact

URL

More Details

Record type

Project

Sector

Mass Transit, Tunnel

Article published date

2026-07-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project