I-35 Capital Express Central Project (Lady Bird Lake segment)
Sector: Mass Transit • Location: Austin, Texas, USA
Source: Community Impact
Crews are reconstructing the Lady Bird Lake bridge from Holly St. to SH 71/Ben White Blvd., adding two HOV lanes in both directions, with a single-point urban interchange planned at Riverside Drive, a pedestrian-only bridge at Woodland Ave., and bike and pedestrian paths along the corridor.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | under construction |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Crews are reconstructing the Lady Bird Lake bridge from Holly St. to SH 71/Ben White Blvd., adding two HOV lanes in both directions, with a single-point urban interchange planned at Riverside Drive, a pedestrian-only bridge at Woodland Ave., and bike and pedestrian paths along the corridor. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
