I-35 Utility Relocations
Sector: Water Supply and Storage • Location: Sanger, Texas, United States of America
Source: Dodge USA
Scope This project consists of approximately 12,700 linear feet of C-900 PVC Water Line, 7,000 linear feet of PVC Sewer pipe and 500 linear feet of HDPE Force Main located between Sanger Sports Park and View Road along I-35. There will also be approximately 11,984 linear feet of water line and 7,404 linear feet of sewer line to be removed and abandoned. This project is reimbursable by TxDOT to the
- Status
- Closed
- Sector
- Water Supply and Storage, Car parking, Power Transmission, Road, Waste Processing and Treatment, Steel, Automotive, Government, Metal, Commercial, Power Generation (CCGT)
- Location
- Sanger, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about I-35 Utility Relocations
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope This project consists of approximately 12,700 linear feet of C-900 PVC Water Line, 7,000 linear feet of PVC Sewer pipe and 500 linear feet of HDPE Force Main located between Sanger Sports Park and View Road along I-35. There will also be approximately 11,984 linear feet of water line and 7,404 linear feet of sewer line to be removed and abandoned. This project is reimbursable by TxDOT to the City of Sanger, and therefore, all materials containing steel shall comply with the Buy America ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Sanger |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Car parking, Power Transmission, Road, Waste Processing and Treatment, Steel, Automotive, Government, Metal, Commercial, Power Generation (CCGT) |
Article published date | 2024-03-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
