logo

I-375 Boulevard Replacement Project

Sector: Waste Processing and Treatment • Location: Detroit, Michigan, United States

Source: The Detroit News

Project
Planned

The Michigan Department of Transportation plans to replace the sunken Interstate 375 freeway in Detroit with a street-level boulevard from Jefferson to Gratiot. The project includes constructing a separated storm sewer to direct stormwater to the Detroit River and rebuilding the Gratiot bridge over the Dequindre Cut. The project aims to reduce the burden on the city's wastewater treatment system a

Status
Prospective
Sector
Waste Processing and Treatment, Road, Water Supply and Storage, Bridge, Government
Location
Detroit, Michigan, United States of America
Updated
22 Jul 2026
Source
The Detroit News

ConstructChat

Ask ConstructChat about I-375 Boulevard Replacement Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “I-375 Boulevard Replacement Project” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Detroit, Michigan, United States. Taiyo aggregates data on it from The Detroit News.

Participants

Sponsoring Agency

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Michigan Department of Transportation plans to replace the sunken Interstate 375 freeway in Detroit with a street-level boulevard from Jefferson to Gratiot. The project includes constructing a separated storm sewer to direct stormwater to the Detroit River and rebuilding the Gratiot bridge over the Dequindre Cut. The project aims to reduce the burden on the city's wastewater treatment system and improve infrastructure, with construction planned for 2027-2028. The cost is estimated at $120 million excluding the I-75 interchange redesign, which could be delayed by up to a decade.

Original sector

Transportation

Budget

Location

Country

United States of America (USA)

State

Michigan

City

Detroit

Source

Source

The Detroit News

URL

More Details

Record type

Project

Sector

Waste Processing and Treatment, Road, Water Supply and Storage, Bridge, Government

Article published date

2025-11-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project