logo

I-4 Ultimate Project

Sector: Road • Location: Florida, United States of America

Source: Build America Bureau (BAB) Projects

Project
Credit Agreement Executed

The I-4 Ultimate project is the reconstruction and widening of 21 miles of I-4 from west of Kirkman Road in Orange County, Florida through downtown Orlando to east of State Road 434 in Seminole County. This public-private partnership (P3) project will: fully reconstruct the existing general purpose lanes; add four express toll lanes in the median; reconstruct 15 major interchanges; and reconstruct

Project Information FAQ

Project Information

5 Q
The project “I-4 Ultimate Project” is an infrastructure initiative in the Road sector, located in Florida, United States of America. Taiyo aggregates data on it from Build America Bureau (BAB) Projects.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

credit agreement executed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The I-4 Ultimate project is the reconstruction and widening of 21 miles of I-4 from west of Kirkman Road in Orange County, Florida through downtown Orlando to east of State Road 434 in Seminole County. This public-private partnership (P3) project will: fully reconstruct the existing general purpose lanes; add four express toll lanes in the median; reconstruct 15 major interchanges; and reconstruct, construct, or widen 140 bridges. The existing general purpose lanes, which range from three to four lanes in each direction, are approximately 50 years old and experience significant levels of congestion. The Florida Department of Transportation (FDOT) will set toll rates and collect all revenue. Access and egress will be provided at five exchange areas (crossover zones) and by direct connectors at major intersections. The project includes numerous aesthetic treatments, including a pedestrian bridge, accent lighting, fountain illumination, art sculptures and monuments, and other architectural treatments.  According to the Project Sponsor, congestion and travel time will be reduced through the addition of four Express Lanes and improved interchange capacity, resulting in a projected average travel speed increase of approximately 15 miles per hour in the peak hours for drivers in the general use lanes.  The project will also implement numerous safety enhancements, including but not limited to the widening of shoulders, removal of weaving sections and left-hand exits, and improvements to interchange signaling, which are estimated to reduce the number of crashes by 13 percent.  The project is expected to generate $1.8 billion in economic development benefits and create approximately 2,000 jobs. By using TIFIA financing and utilizing the P3 delivery method, the Florida Department of Transportation estimates that they will complete the project 25 years sooner and with financing savings of approximately $250 million in net present value when compared to conventional financing methods.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data