I-40 Donelson Pike Interchange Project in Nashville
Sector: Airport • Location: Nashville, United States
Source: Highways Today
Superior Construction, an American family-owned infrastructure contractor, will soon begin relocating the Donelson Pike interchange at Interstate 40 southeast of downtown Nashville, Tennessee. The five-year, $135 million project for the Tennessee Department of Transportation (TDOT) breaks ground this month and will update the junction to a diverging diamond interchange (DDI) design. Superior will
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | ongoing |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Superior Construction, an American family-owned infrastructure contractor, will soon begin relocating the Donelson Pike interchange at Interstate 40 southeast of downtown Nashville, Tennessee. The five-year, $135 million project for the Tennessee Department of Transportation (TDOT) breaks ground this month and will update the junction to a diverging diamond interchange (DDI) design. Superior will also relocate Donelson Pike (SR 255) to the east of the existing roadway to accommodate the new design. The existing interchange (Donelson Pike over I-40) will be repurposed, primarily providing access to expanded BNA facilities. Construction of BNA property by Metro Nashville Airport Authority (MNAA) will occur simultaneously with the planned TDOT project. The interchange was first built in the 1980s to provide access to a new terminal at Nashville International Airport (BNA). The expansion of BNA and subsequent growth in the surrounding area has led to an unprecedented volume of cargo — and traveler-related traffic — demands the current configuration cannot accommodate. Reconstructing this interchange will increase capacity, correct geometric deficiencies, and improve its overall operation, providing efficient access to the airport, I-40 and other nearby businesses. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
