logo
ProjectStudy And Design

I-40 Manuelito Interchange Study, Milepost 7.9 to 8.9

Sector: Road • Location: United States

Source: New Mexico Department of Transportation (NMDOT)

District: 6 County: McKinley Control No.: 6101600

The study area is in McKinley County, New Mexico, at the Interstate 40 (I-40) and New Mexico Highway 118 (NM 118) interchange (Exit 8), approximately 3.4 miles east of Manuelito. It includes a one-mile segment of I-40, from milepost 7.9 to 8.9. The study has been completed. The selected alternative will be carried forward into design development

Status
Prospective
Sector
Road, Bridge
Location
United States of America
Updated
19 Nov 2026
Source
New Mexico Department of Transportation (NMDOT)

ConstructChat

Ask ConstructChat about I-40 Manuelito Interchange Study, Milepost 7.9 to 8.9

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “I-40 Manuelito Interchange Study, Milepost 7.9 to 8.9” is an infrastructure initiative in the Road sector, located in United States. Taiyo aggregates data on it from New Mexico Department of Transportation (NMDOT).

Participants

Not available for this record.

Status

Original status

study and design

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

District: 6 County: McKinley Control No.: 6101600 The study area is in McKinley County, New Mexico, at the Interstate 40 (I-40) and New Mexico Highway 118 (NM 118) interchange (Exit 8), approximately 3.4 miles east of Manuelito. It includes a one-mile segment of I-40, from milepost 7.9 to 8.9. The study has been completed. The selected alternative will be carried forward into design development soon. The proposed design improvements would address: i. Aged, dilapidated and deficient bridge structure over NM 118; ii. Poor stopping sight distance on NM 118; iii. Poor stopping sight distance for I-40 exit and entrance ramps; and iv. Deficient deceleration and stopping sight distance for the interchange exit ramps. The goal is to have Design completed by summer 2027

Original sector

Transportation

Budget

Location

Country

United States of America (USA)

Source

Source

New Mexico Department of Transportation (NMDOT)

URL

More Details

Record type

Project

Sector

Road, Bridge

Article published date

2026-11-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project