I-405 Widening Project from Bellevue to Renton
Sector: Bridge • Location: Washington, USA
Source: My Northwest
Widening project on I-405 corridor from Bellevue to Renton originally scheduled to open by end of 2025. The project is delayed and now forecasted to complete in summer 2027 due to contractor performance issues. The state is suing the contractor for failing to meet commitments.
- Status
- Under Construction
- Sector
- Bridge, Road, Government
- Location
- Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- My Northwest
ConstructChat
Ask ConstructChat about I-405 Widening Project from Bellevue to Renton
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Widening project on I-405 corridor from Bellevue to Renton originally scheduled to open by end of 2025. The project is delayed and now forecasted to complete in summer 2027 due to contractor performance issues. The state is suing the contractor for failing to meet commitments. |
Original sector | Transportation |
Location
Country | United States of America (USA) |
State | Washington |
Source
Source | My Northwest |
URL |
More Details
Record type | Project |
Sector | Bridge, Road, Government |
Article published date | 2025-12-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in USA
- Widen Turnpike Mainline SR 91 from WPB Service Plaza to Okeechobee Blvd SR 704
- Widen Turnpike from Glades Rd to Atlantic Ave
- Add Auxiliary Lanes Turnpike TSMO from SR 821 to Griffin Road SR 818
- Widen Turnpike from Southern Blvd to Okeechobee Blvd
- Widen Turnpike from West Palm Beach Service Plaza to Southern Blvd
- Widen Turnpike Mainline from Neptune Road to Osceola Parkway
- Sand Lake Interchange
- Polk ParkwaySR 570 Bridge Painting Project in Polk County
