I-45 (FM 1764 to Galveston Causeway)
Sector: Bridge • Location: United States of America (USA)
Source: Texas Department of Transportation (TxDOT)
The TxDOT Houston District is proposing to reconstruct and widen Interstate 45 (I-45) from Farm-to-Market Road (FM) 1764 to the Galveston Causeway in Galveston County, Texas. The proposed project will improve the existing roadway to enhance safety and mobility along the highway by reducing traffic congestion and improving the evacuation capability of the highway in instances of flooding and severe
- Sector
- Bridge, Raw Materials, Road, Rail, Government
- Location
- United States of America
- Updated
- 22 Jul 2026
- Source
- Texas Department of Transportation (TxDOT)
ConstructChat
Ask ConstructChat about I-45 (FM 1764 to Galveston Causeway)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The TxDOT Houston District is proposing to reconstruct and widen Interstate 45 (I-45) from Farm-to-Market Road (FM) 1764 to the Galveston Causeway in Galveston County, Texas. The proposed project will improve the existing roadway to enhance safety and mobility along the highway by reducing traffic congestion and improving the evacuation capability of the highway in instances of flooding and severe weather. |
Location
Country | United States of America (USA) |
Source
Source reliability | High |
Source | Texas Department of Transportation (TxDOT) |
URL |
More Details
Record type | Project |
Sector | Bridge, Raw Materials, Road, Rail, Government |
Article published date | 2023-11-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
