logo
ProjectPlanning

I-5 Bridge Replacement Project

One of 56 projects Taiyo tracks in Oregon, Washington.

Source: Central Oregon Daily

The project involves the replacement of the Interstate 5 bridge between Oregon and Washington. The project ambitions have been scaled back due to the doubling of the estimated cost to $14.4 billion.

Status
Prospective
Sector
Bridge
Location
Oregon, Washington, United States of America
Updated
22 Jul 2026
Source
Central Oregon Daily

ConstructChat

Ask ConstructChat about I-5 Bridge Replacement Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “I-5 Bridge Replacement Project” is an infrastructure initiative in the Bridge sector, located in Oregon, Washington, United States. Taiyo aggregates data on it from Central Oregon Daily.

Participants

Not available for this record.

Status

Original status

planning

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves the replacement of the Interstate 5 bridge between Oregon and Washington. The project ambitions have been scaled back due to the doubling of the estimated cost to $14.4 billion.

Original sector

Transportation

Budget

Location

Country

United States of America (USA)

State

Oregon, Washington

Source

Source

Central Oregon Daily

URL

More Details

Record type

Project

Sector

Bridge

Article published date

2026-03-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project