I-5 Bridge Replacement
Sector: Road • Location: Vancouver, Washington, United States
Source: KPTV
Replacement of the Interstate Bridge connecting Portland, Oregon to Vancouver, Washington. The project involves building a new fixed-span bridge to replace the 105-year-old movable bridge, including a light rail connection and wider lanes to reduce congestion. The project cost has increased to $7.65 billion due to inflation and tariffs, with construction now expected to start in 2028.
- Status
- Prospective
- Sector
- Road, Rail, Bridge, Government, Commercial
- Location
- Vancouver, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- KPTV
ConstructChat
Ask ConstructChat about I-5 Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Replacement of the Interstate Bridge connecting Portland, Oregon to Vancouver, Washington. The project involves building a new fixed-span bridge to replace the 105-year-old movable bridge, including a light rail connection and wider lanes to reduce congestion. The project cost has increased to $7.65 billion due to inflation and tariffs, with construction now expected to start in 2028. |
Original sector | Transportation |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Vancouver |
Source
Source | KPTV |
URL |
More Details
Record type | Project |
Sector | Road, Rail, Bridge, Government, Commercial |
Article published date | 2026-03-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
