logo

I-5 Columbia River Bridge Replacement

Sector: Rail • Location: Vancouver and Portland, Washington and Oregon, United States

Source: AOL

Project
Planned

The project involves replacing the current Interstate 5 bridge span between Washington and Oregon, which opened in 1917 and 1958, respectively. The bridge is considered functionally obsolete and the replacement project initially included a light rail component. The estimated cost has increased from $4 billion in 2009 to $13.6 billion in 2026, a 240% increase. The project faced financial hurdles, l

Project Information FAQ

Project Information

4 Q
The project “I-5 Columbia River Bridge Replacement” is an infrastructure initiative in the Rail sector, located in Vancouver and Portland, Washington and Oregon, United States. Taiyo aggregates data on it from AOL.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

planned

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project involves replacing the current Interstate 5 bridge span between Washington and Oregon, which opened in 1917 and 1958, respectively. The bridge is considered functionally obsolete and the replacement project initially included a light rail component. The estimated cost has increased from $4 billion in 2009 to $13.6 billion in 2026, a 240% increase. The project faced financial hurdles, lack of accountability, and a ballot measure to fund rail was defeated. Despite the project's 'demise' in 2013, it has been resurrected with higher costs. Transit demand has fallen while costs have risen, and officials are urged to consider practical solutions without light rail to build a more economical bridge lasting 100 years.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data