I-5 Interstate Bridge Replacement Project
One of 67 projects Taiyo tracks in Oregon and Washington.
Source: City Observatory
The proposed $15 billion I-5 Interstate Bridge Replacement (IBR) Project involves replacing the existing I-5 bridge with a widened freeway and rebuilt interchanges. The project will be partially funded by tolls ranging from $2.00 to $4.65, which are expected to cause significant traffic diversion from the I-5 bridge to the parallel I-205 bridge, leading to congestion on I-205.
- Status
- Prospective
- Sector
- Bridge, Road
- Location
- Portland, Oregon and Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- City Observatory
ConstructChat
Ask ConstructChat about I-5 Interstate Bridge Replacement Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed $15 billion I-5 Interstate Bridge Replacement (IBR) Project involves replacing the existing I-5 bridge with a widened freeway and rebuilt interchanges. The project will be partially funded by tolls ranging from $2.00 to $4.65, which are expected to cause significant traffic diversion from the I-5 bridge to the parallel I-205 bridge, leading to congestion on I-205. |
Original sector | Transportation |
Budget |
Location
Country | United States of America (USA) |
State | Oregon and Washington |
City | Portland |
Source
Source | City Observatory |
URL |
More Details
Record type | Project |
Sector | Bridge, Road |
Article published date | 2026-05-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
