I-5 Marvin Rd to Mounts Rd Planning and Environmental Linkage
Sector: Road • Location: Washington, United States of America
Source: Washington State Department of Transportation (WSDOT)
This project began with a federal Planning and Environmental Linkages (PEL) study focused on I-5 from Marvin Road to Mounts Road. The National Environmental Policy Act (NEPA) environmental review will start in 2023.
This next phase will study I-5 from Marvin Road to Mounts Road (Exit 111 to Exit 116). The PEL considered additional technical analyses and stakeholder input to arrive at a final pur
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This project began with a federal Planning and Environmental Linkages (PEL) study focused on I-5 from Marvin Road to Mounts Road. The National Environmental Policy Act (NEPA) environmental review will start in 2023. This next phase will study I-5 from Marvin Road to Mounts Road (Exit 111 to Exit 116). The PEL considered additional technical analyses and stakeholder input to arrive at a final purpose and need and preferred alternative(s), to advance into the National Environmental Policy Act (NEPA) environmental review. Funding is provided to accelerate work along I-5 through the Nisqually River Delta for preliminary engineering, design and right of way acquisition to address flood risk, improve mobility through the corridor between Mounts and Marvin Roads, and enhance the ecosystem at the I-5 Nisqually Delta crossing. Funding is also provided to construct three roundabouts on SR 507 as the only viable alternative to I-5. To subscribe to updates, click the link underneath the photo of the map and enter your email address when prompted. This page serves as the landing point for a potential future project. There is no construction planned at this time and traffic is not affected in this area. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
