I-59/20 Widening Project
Sector: Road • Location: Alabama, United States
Source: AOL
The Alabama Department of Transportation is proposing to widen I-59/20 between Hueytown and Fairfield by adding a lane in each direction from Valley Road north to Fairfield Boulevard. The project also includes replacing two bridges at Aaron Aronov Drive and Valley Road. Construction is scheduled to start by the end of 2027 and last up to 24 months.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | planned |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Alabama Department of Transportation is proposing to widen I-59/20 between Hueytown and Fairfield by adding a lane in each direction from Valley Road north to Fairfield Boulevard. The project also includes replacing two bridges at Aaron Aronov Drive and Valley Road. Construction is scheduled to start by the end of 2027 and last up to 24 months. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
