logo
ProjectPlanned

I-59/20 Widening Project

One of 10,000+ projects Taiyo tracks in Alabama.

Source: AOL

The Alabama Department of Transportation is proposing to widen I-59/20 between Hueytown and Fairfield by adding a lane in each direction from Valley Road north to Fairfield Boulevard. The project also includes replacing two bridges at Aaron Aronov Drive and Valley Road. Construction is scheduled to start by the end of 2027 and last up to 24 months.

Status
Prospective
Sector
Road
Location
Alabama, United States of America
Updated
22 Jul 2026
Source
AOL

ConstructChat

Ask ConstructChat about I-59/20 Widening Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “I-59/20 Widening Project” is an infrastructure initiative in the Road sector, located in Alabama, United States. Taiyo aggregates data on it from AOL.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Alabama Department of Transportation is proposing to widen I-59/20 between Hueytown and Fairfield by adding a lane in each direction from Valley Road north to Fairfield Boulevard. The project also includes replacing two bridges at Aaron Aronov Drive and Valley Road. Construction is scheduled to start by the end of 2027 and last up to 24 months.

Original sector

Transportation

Location

Country

United States of America (USA)

State

Alabama

Source

Source

AOL

URL

More Details

Record type

Project

Sector

Road

Article published date

2026-05-31

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project