I-695 Sparrows Point Project
Sector: Advanced Electronics • Location: Baltimore, Maryland, United States of America (USA)
Source: Maryland Transportation Authority (MDTA)
The MDTA Board approved The Six-M Company Inc. for the construction services contract. The contract involves construction of a structurally supported concrete slab to replace a section of pavement and prevent future settlement of the roadway near the MD 157 (Peninsula Expressway) underpass; repair of backwalls, approaches, and miscellaneous superstructure repairs at six bridges crossing Bear Creek
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | ongoing |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The MDTA Board approved The Six-M Company Inc. for the construction services contract. The contract involves construction of a structurally supported concrete slab to replace a section of pavement and prevent future settlement of the roadway near the MD 157 (Peninsula Expressway) underpass; repair of backwalls, approaches, and miscellaneous superstructure repairs at six bridges crossing Bear Creek, MD 157 and the Tradepoint Atlantic Railroad; pavement patching; traffic barrier replacement; and drainage repairs. Expected to begin major construction early in 2024, this system preservation project is necessary to address settlement of I-695 that has occurred since it was widened to a multi-lane, median-divided highway in the 1990s. Additional work also will be completed to rehabilitate and enhance the safety of I-695 in this area. Construction is expected to be complete in summer/fall 2025. The project spans nearly three miles along the Baltimore Beltway, from the Broening Highway interchange (Exit 44) to just west of the MD 151 North Point Boulevard interchange (Exit 42). Throughout construction, I-695 will remain open with at least one lane of traffic in each direction maintained at all times. However, drivers are encouraged to plan ahead and should expect 5- to 10-minute delays during morning and afternoon rush hours. The MDTA has designed the project in phases, with simultaneous work occurring to help minimize the impact to our motorists and local communities and businesses. To accommodate simultaneous work, drivers should expect contraflow traffic conditions across Bear Creek: one side of the bridge will be closed to traffic, while the other side will have one lane open in each direction. Additionally, detours will be in effect during the second and third phases of the project, when the I-695 inner loop ramp to MD 157/MD 158, then the MD 158 ramp to I-695 outer loop, respectively, will be closed. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
