I-75 @ CR 355/OLD HATLEY ROAD
Sector: Bridge • Location: Cordele, Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
The project proposes to replace the existing bridge located on CR 355/Old Hatley Rd over I-75 in Crisp County. The new bridge will have two 12-foot lanes (one in each direction) with two 5-ft shoulders, and 2-42” S-barriers. The new total width will be 37’-3” (previous 33’-1”). The project has a total project length of 0.256 miles.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | long range program |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project proposes to replace the existing bridge located on CR 355/Old Hatley Rd over I-75 in Crisp County. The new bridge will have two 12-foot lanes (one in each direction) with two 5-ft shoulders, and 2-42” S-barriers. The new total width will be 37’-3” (previous 33’-1”). The project has a total project length of 0.256 miles. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
