logo
ProjectComplete

I-75 @ CR 7958/WINDY HILL RD - DIVERGING DIAMOND INTERCHANGE

Complete · Georgia

Source: Georgia Department of Transportation (GDOT)

Several alternatives were studied, two of which included a Diverging Diamond Interchange (DDI) configuration. The DDI configuration crosses the traffic flow on either side of the interstate eliminating the left-turn phases at the traffic signals. Traffic flow is improved without the addition of extra lanes and without reconstructing the existing bridge over the interstate. The purpose for improve

Status
Closed
Sector
Bridge, Car parking, Road, Government, Automotive, Manufacturing (Industrial)
Location
Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about I-75 @ CR 7958/WINDY HILL RD - DIVERGING DIAMOND INTERCHANGE

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “I-75 @ CR 7958/WINDY HILL RD - DIVERGING DIAMOND INTERCHANGE” is an infrastructure initiative in the Bridge sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Sponsoring Agency

Status

Original status

complete

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Several alternatives were studied, two of which included a Diverging Diamond Interchange (DDI) configuration. The DDI configuration crosses the traffic flow on either side of the interstate eliminating the left-turn phases at the traffic signals. Traffic flow is improved without the addition of extra lanes and without reconstructing the existing bridge over the interstate. The purpose for improvements to the Windy Hill Road interchange is to address the primary needs of improved traffic congestion and better traffic flow management, improve mobility options for the traveling public, and provide safer travel conditions for motorist and pedestrians. Sidewalks would also be constructed on both sides of Windy Hill Road at the approaches to the bridge over I-75 and be provided in the center median area of the DDI.

Location

Country

United States of America (USA)

State

Georgia

Source

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Bridge, Car parking, Road, Government, Automotive, Manufacturing (Industrial)

Article published date

2024-03-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project