I-75 @ CUMBERLAND BLVD - INTERCHANGE BEAUTIFICATION
Sector: Bridge • Location: Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
The project is proposed to begin on the west side of the Cumberland Blvd Bridge over I-75 and end on the east side of the Cumberland Blvd Bridge over I-75 for a total length of 400 LF. The project consists of removing the existing standard chain link fencing along the Cumberland Blvd Bridge and replacing it with ornamental fencing on both sides. The new ornamental fencing will be installed on top
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | complete |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project is proposed to begin on the west side of the Cumberland Blvd Bridge over I-75 and end on the east side of the Cumberland Blvd Bridge over I-75 for a total length of 400 LF. The project consists of removing the existing standard chain link fencing along the Cumberland Blvd Bridge and replacing it with ornamental fencing on both sides. The new ornamental fencing will be installed on top of the existing parapet in 12’ wide panels that are 8’-2” in height. A unique structure, which will incorporate three large arches, will be added to the south side of the bridge. These arches will be made from aluminum panels and will incorporate decorative LED strip lighting, to enhance aesthetics. Also, a 6’9” x 23’ decorative sign that includes the Cumberland CID logo will be incorporated into the project by mounting it to the structural tubing that will be installed to support the decorative fencing. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
