logo

I-75 / Fruitville Road Interchange Project

Sector: Education • Location: Sarasota, Florida, United States of America (USA)

Source: Florida Department of Transportation (FDOT)

Project
Ongoing

The Florida Department of Transportation (FDOT), along with Sarasota County, has identified the need to make improvements to the I-75 / Fruitville Road (SR 780) interchange to improve highway operations, safety, and regional mobility. This design project includes reconstruction of the interchange at Fruitville Road in Sarasota County. The Department will rebuild the interchange from the existing p

Project Information FAQ

Project Information

5 Q
The project “I-75 / Fruitville Road Interchange Project” is an infrastructure initiative in the Education sector, located in Sarasota, Florida, United States of America (USA). Taiyo aggregates data on it from Florida Department of Transportation (FDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Florida Department of Transportation (FDOT), along with Sarasota County, has identified the need to make improvements to the I-75 / Fruitville Road (SR 780) interchange to improve highway operations, safety, and regional mobility. This design project includes reconstruction of the interchange at Fruitville Road in Sarasota County. The Department will rebuild the interchange from the existing partial cloverleaf design to a diverging diamond interchange (DDI). The DDI shifts eastbound traffic to the left to allow for improved access to northbound I-75 and shifts westbound traffic to the left to allow for improved access to southbound I-75. This approach reduces the number of phases for the signals and improves delay times. A similar type of interchange has recently been constructed and is now in operation at I-75 / University Parkway, which is the next interchange north of this project. The project will widen about 2 miles of I-75, from Palmer Boulevard to north of Fruitville Road, to a six-lane highway with three through lanes per direction and will replace the existing bridges over Fruitville Road. The project also includes widening of about 1.6 miles of Fruitville Road from Honore Avenue to east of Coburn Road. A future ultimate I-75 design project will widen the interstate from interim six lanes to ten lanes. The project includes two express lanes and three general use lanes in each direction within the project limits. Ultimate improvements are planned to extend acceptable level of service for I-75 well beyond 2050.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data