I-75 @ SR 20 - DIVERGING DIAMOND INTERCHANGE
The status, timeline and source of this project. A free account opens every field.
Source: Georgia Department of Transportation (GDOT)
The project proposes to convert the existing interchange into a Diverging Diamond Interchange. The project proposes to maintain the existing bridge deck and parapet but remove the existing sidewalk. New ornamental fence will replace the existing fence on the bridge and will be attached to the existing parapet. A 10-foot wide sidewalk will be constructed along the centerline of the bridge flanked b
- Status
- Closed
- Sector
- Car parking, Bridge, Road, Government, Automotive
- Location
- McDonough, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about I-75 @ SR 20 - DIVERGING DIAMOND INTERCHANGE
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project proposes to convert the existing interchange into a Diverging Diamond Interchange. The project proposes to maintain the existing bridge deck and parapet but remove the existing sidewalk. New ornamental fence will replace the existing fence on the bridge and will be attached to the existing parapet. A 10-foot wide sidewalk will be constructed along the centerline of the bridge flanked by single-faced barrier wall with two-foot shy distance to the through lanes. SR 20 eastbound will be three lanes (two thru lanes 12’-4” wide, and one left turn lane 12’-5” wide), and SR 20 westbound will be three lanes (two thru lanes 12’-4” wide, and one left turn lane 12’-5” wide). A 4-foot shy distance will be provided between the left turn lanes and the new barrier. |
Location
Country | United States of America (USA) |
State | Georgia |
City | McDonough |
Source
Source reliability | High |
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Car parking, Bridge, Road, Government, Automotive |
Article published date | 2024-01-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
