logo
ProjectComplete

I-75 @ SR 20 - DIVERGING DIAMOND INTERCHANGE

Sector: Bridge • Location: McDonough, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

The project proposes to convert the existing interchange into a Diverging Diamond Interchange. The project proposes to maintain the existing bridge deck and parapet but remove the existing sidewalk. New ornamental fence will replace the existing fence on the bridge and will be attached to the existing parapet. A 10-foot wide sidewalk will be constructed along the centerline of the bridge flanked b

Status
Closed
Sector
Bridge, Road, Car parking, Automotive
Location
McDonough, Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about I-75 @ SR 20 - DIVERGING DIAMOND INTERCHANGE

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “I-75 @ SR 20 - DIVERGING DIAMOND INTERCHANGE” is an infrastructure initiative in the Bridge sector, located in McDonough, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Not available for this record.

Status

Original status

complete

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project proposes to convert the existing interchange into a Diverging Diamond Interchange. The project proposes to maintain the existing bridge deck and parapet but remove the existing sidewalk. New ornamental fence will replace the existing fence on the bridge and will be attached to the existing parapet. A 10-foot wide sidewalk will be constructed along the centerline of the bridge flanked by single-faced barrier wall with two-foot shy distance to the through lanes. SR 20 eastbound will be three lanes (two thru lanes 12’-4” wide, and one left turn lane 12’-5” wide), and SR 20 westbound will be three lanes (two thru lanes 12’-4” wide, and one left turn lane 12’-5” wide). A 4-foot shy distance will be provided between the left turn lanes and the new barrier.

Location

Country

United States of America (USA)

State

Georgia

City

McDonough

Source

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Bridge, Road, Car parking, Automotive

Article published date

2026-04-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project