logo

I-75 @ SR 215

Sector: Automotive • Location: Vienna, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

The project will modifty the existing interchange of I-75 at SR 215 approximately two miles east of downtown Vienna. The approved proposed widening of SR 215 from just west of the intersection of SR 215 at Pig Jig Road to the intersection of SR 215 at Cason Road for approximately 1.0 mile, including the replacement of the existing bridge carrying SR 215 over I-75. The existing two lane bridge ca

Project Information FAQ

Project Information

4 Q
The project “I-75 @ SR 215” is an infrastructure initiative in the Automotive sector, located in Vienna, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project will modifty the existing interchange of I-75 at SR 215 approximately two miles east of downtown Vienna. The approved proposed widening of SR 215 from just west of the intersection of SR 215 at Pig Jig Road to the intersection of SR 215 at Cason Road for approximately 1.0 mile, including the replacement of the existing bridge carrying SR 215 over I-75. The existing two lane bridge carrying SR 215 over I-75 would be replaced with a three lane bridge (one through lane in each direction with a 14’ wide center turn lane).Right turn lanes will be provided from and onto SR 215. The proposed bridge would be designed to accommodate future widening of I-75. The ramps will be reconstructed to provide improved acceleration and deceleration, and to provide ramp terminal spacing of 1000 feet. The project would improve capacity and safety by providing sufficient storage space for vehicles and trucks on the bridge and ramp geometry that meets current design standards.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data