logo
ProjectComplete

I-75 @ SR 3/US 41/ROCKY FACE EXIT - INT RECONST PHASE II

One of 10,000+ projects Taiyo tracks in Georgia.

Source: Georgia Department of Transportation (GDOT)

The proposed project, reconstruction of the I-75 at Rocky Face interchange, lies entirely in the northern limits of the City of Dalton, in Whitfield County. The project length along I-75 is 1.04 miles (mile post 335.07 to mile post 336.11), along SR 3/US 41/US 76 (Rocky Face) is 0.70 miles (mile post 20.9 to mile post 20.2). The interchange configuration will remain as a diamond interchange with a

Status
Closed
Sector
Bridge, Power Transmission, Road, Government, Power Generation (CCGT), Manufacturing (Industrial)
Location
Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about I-75 @ SR 3/US 41/ROCKY FACE EXIT - INT RECONST PHASE II

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “I-75 @ SR 3/US 41/ROCKY FACE EXIT - INT RECONST PHASE II” is an infrastructure initiative in the Bridge sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Sponsoring Agency

Status

Original status

complete

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed project, reconstruction of the I-75 at Rocky Face interchange, lies entirely in the northern limits of the City of Dalton, in Whitfield County. The project length along I-75 is 1.04 miles (mile post 335.07 to mile post 336.11), along SR 3/US 41/US 76 (Rocky Face) is 0.70 miles (mile post 20.9 to mile post 20.2). The interchange configuration will remain as a diamond interchange with an additional ramp in the northwest quadrant. The existing I-75 median will be utilized to accommodate the future lane to the inside. Ramp improvements will be to the outside. The I-75 Bridge over SR3 will be replaced and the I-75 Bridge over Mill Creek will be widened. The NB and SB exit ramps and NB entrance ramp will be reconstructed. SR 3 will be widened with an add'l lane in each direction to a six lane roadway with urban shoulder and a 20' raised median, which will accommodate single left turn lane to access I-75 NB & SB. Traffic signals will be modified at major intersections.

Location

Country

United States of America (USA)

State

Georgia

Source

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Bridge, Power Transmission, Road, Government, Power Generation (CCGT), Manufacturing (Industrial)

Article published date

2024-05-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project