logo

I-75 at Overpass Road New Interchange

Sector: Bridge • Location: Wesley Chapel, Florida, United States of America (USA)

Source: Florida Department of Transportation (FDOT)

Project
Completed

This design-build project constructed a new interstate interchange on I-75 at Overpass Road, approximately 3.5 miles south of SR 52 in Pasco County. The new diamond interchange includes a flyover ramp for westbound Overpass Road access onto southbound I-75. To accommodate the new interchange, Overpass Road was widened from two lanes to four lanes between the interstate and Old Pasco Road and six l

Project Information FAQ

Project Information

5 Q
The project “I-75 at Overpass Road New Interchange” is an infrastructure initiative in the Bridge sector, located in Wesley Chapel, Florida, United States of America (USA). Taiyo aggregates data on it from Florida Department of Transportation (FDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This design-build project constructed a new interstate interchange on I-75 at Overpass Road, approximately 3.5 miles south of SR 52 in Pasco County. The new diamond interchange includes a flyover ramp for westbound Overpass Road access onto southbound I-75. To accommodate the new interchange, Overpass Road was widened from two lanes to four lanes between the interstate and Old Pasco Road and six lanes between the interstate and Boyette Road. Blair Drive was realigned to connect with Old Pasco Road. McKendree Road was realigned to connect with Boyette Road. Sidewalks were built along Overpass Road. A 10-foot wide sidewalk was constructed on the north side of Overpass Road (next to the westbound traffic lanes) and a 6-foot wide sidewalk was built on the south side (next to the eastbound traffic lanes).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data