logo

I-75 (State Road 93) Milling and Resurfacing Project

Sector: Bridge • Location: Lake City, Florida, United States of America

Source: Florida Department of Transportation (FDOT)

Project
Active

The asphalt resurfacing project consists of removing and replacing the upper layers of asphalt, asphalt grade adjustments, concrete pier protection installation at the overpasses, drainage improvements and rehabilitation, new highway signing and pavement markings, bridge rehabilitation, wrong-way detection system installation at the interchanges, guardrail replacement, concrete ditch pavement inst

Project Information FAQ

Project Information

5 Q
The project “I-75 (State Road 93) Milling and Resurfacing Project” is an infrastructure initiative in the Bridge sector, located in Lake City, Florida, United States of America. Taiyo aggregates data on it from Florida Department of Transportation (FDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The asphalt resurfacing project consists of removing and replacing the upper layers of asphalt, asphalt grade adjustments, concrete pier protection installation at the overpasses, drainage improvements and rehabilitation, new highway signing and pavement markings, bridge rehabilitation, wrong-way detection system installation at the interchanges, guardrail replacement, concrete ditch pavement installation, rumble strip installation, and other incidental construction items from south of County Road 240 to State Road 47 as well as I-10 (State Road 8) to the Suwannee County line. Traffic will be maintained in accordance with FDOT design standards throughout the project. Drivers can expect nighttime, single-lane closures Monday through Friday during off-peak hours. Construction completion dates are fluid and subject to change based on weather and schedule permitting.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data