I-80 Bridge Deck Replacement and Repairs
Sector: Road • Location: Henry County, Illinois, United States
Source: KWQC
Removal and replacement of bridge decks on multiple structures on I-80 from the Rock River to south of U.S. 6 in Henry County. Includes pavement patching and resurfacing of 5.7 miles of I-80. Colona interchange closed for westbound traffic during construction. Part of the Rebuild Illinois capital program.
- Status
- Under Construction
- Sector
- Road, Bridge, Government
- Location
- Henry County, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- KWQC
ConstructChat
Ask ConstructChat about I-80 Bridge Deck Replacement and Repairs
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Removal and replacement of bridge decks on multiple structures on I-80 from the Rock River to south of U.S. 6 in Henry County. Includes pavement patching and resurfacing of 5.7 miles of I-80. Colona interchange closed for westbound traffic during construction. Part of the Rebuild Illinois capital program. |
Original sector | Transportation |
Location
Country | United States of America (USA) |
State | Illinois |
City | Henry County |
Source
Source | KWQC |
URL |
More Details
Record type | Project |
Sector | Road, Bridge, Government |
Article published date | 2025-11-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
