I-80 Middle Road Interchange Closure and Gateway Pedestrian Bridge Work
Sector: Bridge • Location: Bettendorf, Iowa, United States
Source: Iowa Department of Transportation (.gov)
The Iowa DOT and the City of Bettendorf plan to close the Interstate 80 Middle Road Interchange (Exit 301) to continue work on Middle Road and the new Gateway pedestrian bridge. The closure will occur weekly from Tuesday morning to Friday morning on specified dates to facilitate construction activities.
- Status
- Under Construction
- Sector
- Bridge
- Location
- Bettendorf, Iowa, United States of America
- Updated
- 22 Jul 2026
- Source
- Iowa Department of Transportation (.gov)
ConstructChat
Ask ConstructChat about I-80 Middle Road Interchange Closure and Gateway Pedestrian Bridge Work
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Iowa DOT and the City of Bettendorf plan to close the Interstate 80 Middle Road Interchange (Exit 301) to continue work on Middle Road and the new Gateway pedestrian bridge. The closure will occur weekly from Tuesday morning to Friday morning on specified dates to facilitate construction activities. |
Original sector | Transportation |
Location
Country | United States of America (USA) |
State | Iowa |
City | Bettendorf |
Source
Source | Iowa Department of Transportation (.gov) |
URL |
More Details
Record type | Project |
Sector | Bridge |
Article published date | 2026-07-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in United States
- Atlas Air Worldwide and Titan Aviation Holdings Announce Financing Facilities with CDPQ, BNP Paribas, and volofin
- Route 29 Tunnel, Trenton, NJ
- Ortega Highway Interchange Replacement Project
- Elgin O’Hare Western Access Project, Illinois
- Queen Elizabeth Way Widening
- I-485 Charlotte Outer Loop, North Carolina
- Kosciuszko Bridge Replacement Project, New York, US
- Complete 540 (Triangle Expressway Southeast Extension), North Carolina
