logo
ProjectUnder Construction

I-81 Northbound at Exit 105 New River Bridge Replacement

Under construction · Virginia · Last reported Mar 2025

Source: Virginia Department of Transportation (VDOT)

Traffic has been switched onto the newly constructed bridge over the New River, with ongoing lane and shoulder closures for the project.

Status
Under Construction
Sector
Road, Bridge
Location
Virginia, United States of America
Updated
22 Jul 2026
Source
Virginia Department of Transportation (VDOT)

ConstructChat

Ask ConstructChat about I-81 Northbound at Exit 105 New River Bridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “I-81 Northbound at Exit 105 New River Bridge Replacement” is an infrastructure initiative in the Road sector, located in Virginia, United States. Taiyo aggregates data on it from Virginia Department of Transportation (VDOT).

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Traffic has been switched onto the newly constructed bridge over the New River, with ongoing lane and shoulder closures for the project.

Original sector

Transportation

Location

Country

United States of America (USA)

State

Virginia

Source

Source

Virginia Department of Transportation (VDOT)

URL

More Details

Record type

Project

Sector

Road, Bridge

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project