I-81 Resurfacing Project in Onondaga County
Sector: Road • Location: Syracuse, New York, United States
Source: Spectrum News
A $11.2 million project to resurface nearly 20 lane miles of Interstate 81 from exits 5B-5A-4B to Exit 8 in Onondaga County. The project involves milling four inches of worn pavement along three lanes in each direction and replacing it with warm-mix asphalt, including resurfacing of certain on-and-off ramps.
- Status
- Under Construction
- Sector
- Road, Commercial, Residential
- Location
- Syracuse, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Spectrum News
ConstructChat
Ask ConstructChat about I-81 Resurfacing Project in Onondaga County
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A $11.2 million project to resurface nearly 20 lane miles of Interstate 81 from exits 5B-5A-4B to Exit 8 in Onondaga County. The project involves milling four inches of worn pavement along three lanes in each direction and replacing it with warm-mix asphalt, including resurfacing of certain on-and-off ramps. |
Original sector | Transportation |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Syracuse |
Source
Source | Spectrum News |
URL |
More Details
Record type | Project |
Sector | Road, Commercial, Residential |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
