logo

I-81 Widening and Exit 317 Improvements

Sector: Power Transmission • Location: Winchester, Virginia, United States

Source: Virginia Department of Transportation (VDOT)

Project
Planned

This project involves widening Interstate 81 from about mile marker 317 to 319 and improving the I-81 exit 317 interchange with Route 11 (Martinsburg Pike) in Frederick County, Virginia. The project includes adding a third lane northbound and southbound on I-81, replacing bridges over two railways and Route 11 to improve vertical clearance, constructing a diverging diamond interchange at exit 317

Project Information FAQ

Project Information

4 Q
The project “I-81 Widening and Exit 317 Improvements” is an infrastructure initiative in the Power Transmission sector, located in Winchester, Virginia, United States. Taiyo aggregates data on it from Virginia Department of Transportation (VDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

planned

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project involves widening Interstate 81 from about mile marker 317 to 319 and improving the I-81 exit 317 interchange with Route 11 (Martinsburg Pike) in Frederick County, Virginia. The project includes adding a third lane northbound and southbound on I-81, replacing bridges over two railways and Route 11 to improve vertical clearance, constructing a diverging diamond interchange at exit 317 to enhance safety and reduce congestion, realigning the northbound I-81 off-ramp, relocating Route 661 (Redbud Road), building a new shared-use path along Route 11, converting Route 661 and Crown Lane to one-way roads near Route 11, and constructing a new park-and-ride facility near the Welltown/Crown intersection. The projects will be bundled under a single design-build contract and coordinated with the planned widening of I-81 between mile markers 312.2 and 317.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data