I-83 Bridge Project
The status, timeline and source of this project. A free account opens every field.
Source: One United Lancaster
Residents in a homeless encampment along Front Street in Harrisburg are increasingly on edge as the construction process of a new bridge across the Susquehanna River begins. A core drilling was carried out near the camp to assess the ground in preparation for the construction.
- Status
- Under Construction
- Sector
- Bridge, Road
- Location
- Harrisburg, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- One United Lancaster
ConstructChat
Ask ConstructChat about I-83 Bridge Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Residents in a homeless encampment along Front Street in Harrisburg are increasingly on edge as the construction process of a new bridge across the Susquehanna River begins. A core drilling was carried out near the camp to assess the ground in preparation for the construction. |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Harrisburg |
Source
Source | One United Lancaster |
URL |
More Details
Record type | Project |
Sector | Bridge, Road |
Article published date | 2025-03-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
