logo

I-84 Widening Project, Waterbury, Connecticut, US

Sector: Bridge • Location: United States

Source: Road Traffic Technology

Project
Closed

The ground breaking ceremony for the I-84 widening project was held on 1 April 2015 and was attended by governor Malloy, senator Joan Hartley, CTDOT commissioner Redeker and CTDOT staff. Credit: Aecom. Widening the I-84 involves the reconstruction and realignment of a river, brook and stream. Credit: Aecom. The $325m project is expected to be completed by June 2020. Credit: Aecom. A new travel lan

Project Information FAQ

Project Information

3 Q
The project “I-84 Widening Project, Waterbury, Connecticut, US” is an infrastructure initiative in the Bridge sector, located in United States. Taiyo aggregates data on it from Road Traffic Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The ground breaking ceremony for the I-84 widening project was held on 1 April 2015 and was attended by governor Malloy, senator Joan Hartley, CTDOT commissioner Redeker and CTDOT staff. Credit: Aecom. Widening the I-84 involves the reconstruction and realignment of a river, brook and stream. Credit: Aecom. The $325m project is expected to be completed by June 2020. Credit: Aecom. A new travel lane will be constructed under the project. Credit: Aecom. A joint venture (JV) of Empire Paving and Yonkers Contracting is the lead contractor for the I-84 widening project. Credit: Aecom. The I-84 Waterbury project is a corridor expansion project of Interstate 84, which runs across the state of Connecticut through Danbury, Waterbury, Hartford and Union, US. The project comprises widening and safety improvements to a 2.7-mile (4.34km) portion of the interstate from Washington Street in the east to Pierpont Road in the city of Waterbury. The I-84 intersects with major junctions at US-7 / US 202 in Danbury, Route 8 in Waterbury, I-691 near Cheshire, Route 9 near West Hartford, I-91 in Hartford, Route2 / Route 15 near East Hartford, and I-384 / I-291 near Union. The widening project aims to improve safety, operations, highway capacity and traffic flow. It will also help to manage and reduce traffic congestion along the mainline, connecting streets and the ramp weaves on the I-84 in the city of Waterbury. The widening project is estimated to generate 3,000 construction jobs and 3,700 ancillary jobs. The project is scheduled for completion in June 2020. The $325m highway widening project was launched on 30 March 2015 by the Connecticut Department of Transportation in collaboration with the Federal Highway Association and I-84 constructors. The groundbreaking ceremony was held in April 2015. The widening project involves the addition of a third travel lane and full-width shoulders in each direction. It also includes the realignment of the interstate roadway near Harpers Ferry road to eliminate the existing ‘S’ curve. State and local road intersections that will be reconstructed under the project include Hamilton Avenue, Harpers Ferry Road, Scott Road, Plank Road, Reidville Drive, Plank Road East and East Main Street. The project also comprises the construction of eight highway bridges, including four over the watercourse, and a pedestrian crossing over the Mad River. It includes seven culverts (five within the Beaver Pond brook, one within East Mountain Brook and the remaining within the Mad River) and 20 retaining walls. Five existing culverts constructed with a corrugated metal pipe, located under the highway embankments, will be upgraded. Traffic signals, new highway illumination, signs and pavement markings will be either replaced or upgraded accordingly under the project. Public utilities including sanitary sewer and potable water will either be replaced or relocated. The widened I-84 will comprise a 12ft-wide right shoulder, three 12ft-wide travel lanes and a 12ft-wide left shoulder in each direction that will be separated by a 10ft-wide concrete barrier section. A 12ft auxiliary lane will be constructed on the I-84 westbound between the on-ramp from Harpers Ferry Road and the off-ramp to Hamilton Avenue. Construction began in April 2015 with tree clearing and building a waste stockpile area, as well as placement of construction signage throughout the project area. I-84’s westbound exit 24 will remain closed until 2019 with motorists being diverted to exit 25 at Scott Road. Direct access to Harpers Ferry Road from I-84 Westbound will be directed via an extension of Plank Road between Scott Road and Harpers Ferry Road. The highway widening project was awarded to I-84 Constructors JV, a joint venture of Empire Paving and Yonkers Contracting. Ammann & Whitney were selected to provide preliminary and final design services for the project. AECOM and Lochner were also contracted to work on the project. A M Rizzo Electrical Contractors were subcontracted to provide lighting work along the highway. The total cost of the widening project is estimated to be $325m. The State Bond Commission approved $145m as Connecticut’s share of the project cost. The remaining $180m will be funded by the Federal Highway Administration.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data