I-85 @ CR 103/POPLAR ROAD - NEW INTERCHANGE
Sector: Car parking • Location: Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
Project CSNHS-0009-00(323) proposes to construct a new interstate access point along I-85 at Poplar Road just east of the City of Newnan in central Coweta County Georgia. The project would include the construction of a fully directional interchange with entrance and exit ramps, removal and replacement of the existing Poplar Road overpass, and the widening and reconstruction of Poplar Road approach
- Status
- Closed
- Sector
- Car parking, Road, Government, Automotive
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about I-85 @ CR 103/POPLAR ROAD - NEW INTERCHANGE
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project CSNHS-0009-00(323) proposes to construct a new interstate access point along I-85 at Poplar Road just east of the City of Newnan in central Coweta County Georgia. The project would include the construction of a fully directional interchange with entrance and exit ramps, removal and replacement of the existing Poplar Road overpass, and the widening and reconstruction of Poplar Road approaching and departing the proposed interchange. The typical cross section of Poplar Road would include four 11-foot wide lanes (two in each direction) separated by a raised 20-foot wide median with urban shoulder sections. The proposed cross section would incorporate pedestrian friendly streetscape facilities and amenities including 5-foot wide sidewalks illuminated by overhead street lights. The typical cross section of the interchange ramps will consist of a 16-foot wide travel lane with a six-foot wide (4-foot paved) inside shoulder and an 8-foot wide (6-foot paved) outside shoulder. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Car parking, Road, Government, Automotive |
Article published date | 2024-05-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
