I-85 @ SR 140 - PE ONLY
Complete · Georgia
Source: Georgia Department of Transportation (GDOT)
The proposed project will reconstruct the existing, tight-urban Diamond Interchange to a Diverging Diamond Interchange (DDI). The proposed improvements will 'cross-over' the traffic directions in advance of the SR 140/Jimmy Carter Boulevard bridge to obtain free-flow operation for the heavy left-turn volumes accessing the I-85 entrance ramps. The number of through lanes along SR 140 on the appro
- Status
- Closed
- Sector
- Bridge, Road, Government
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about I-85 @ SR 140 - PE ONLY
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project will reconstruct the existing, tight-urban Diamond Interchange to a Diverging Diamond Interchange (DDI). The proposed improvements will 'cross-over' the traffic directions in advance of the SR 140/Jimmy Carter Boulevard bridge to obtain free-flow operation for the heavy left-turn volumes accessing the I-85 entrance ramps. The number of through lanes along SR 140 on the approach to I-85 will be maintained. By using the 'cross-over' intersection, the signal phasing can be simplified to operate in a two-phase manner. This operation allows the left-turn movements from the I-85 exit ramps onto SR 140 to overlap with the through-traffic cross-over movement. This eliminates one phase in the signal operation and improvess access to SR 140 from the I-85 ramps. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Bridge, Road, Government |
Article published date | 2024-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- I-95 NB @ ST MARYS RIVER - BRIDGE REHAB
- CR 111/ CAIN CREEK RD--CULVERT & APPR @ CROOKED CREEK TRIB
- JOINT REHABILITATION PROJECT ON 12 BRIDGES IN DIST 5|511440
- SR 112 BRIDGE OVER BOLLINGER CREEK| IMPROVE CR 77 FOR DETOUR
- CR 243/BROOKS ROAD @ ALCOVY RIVER
- I-185 @ SR 116; MOUNTAIN OAK CREEK & HOPEWELL CHURCH RD
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
