logo

I-85 FROM N OF CR 417/FOREST ROAD TO N OF SR 34

Sector: Bridge • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Under Construction

This project proposes Inside widening of 13.655 miles of SR 403/I-85 from north of Forest Road (M.P. # 33.259) in Meriwether County to north of SR 34 (M.P. # 46.914) in Coweta County. The project will provide 3-12 ft. lanes, 14 ft. inside and outside shoulder (12 ft. paved), in each direction divided with barrier and variable width (20 ft.-40 ft.) depressed grass median. This project will widen ex

Project Information FAQ

Project Information

4 Q
The project “I-85 FROM N OF CR 417/FOREST ROAD TO N OF SR 34” is an infrastructure initiative in the Bridge sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

under construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project proposes Inside widening of 13.655 miles of SR 403/I-85 from north of Forest Road (M.P. # 33.259) in Meriwether County to north of SR 34 (M.P. # 46.914) in Coweta County. The project will provide 3-12 ft. lanes, 14 ft. inside and outside shoulder (12 ft. paved), in each direction divided with barrier and variable width (20 ft.-40 ft.) depressed grass median. This project will widen existing Bridges over SR 14/CSX railroad, Bethlehelm Church Rd., CSX Railroad , SR14/US 27Alt.,Turkey Creek Road , CSX Railroad and SR34. The project further includes raising(Jacking) of Bridge on SR 16, Big Poplar Road and Lower Fayetteville Road, over I-85 to improve vertical clearances to minimum of 17 ft. The design speed is 70 MPH. The current traffic volumes are 57,200 ADT(2007) and 93,700 ADT (2027).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data