I-85 NB HOV TO HOT CONVERSION IMPLEMENTATION PROJECT
Complete · Georgia
Source: Georgia Department of Transportation (GDOT)
This project represents the roadway portion of the I-85 North HOV to HOT conversion. Included in this GDOT let contract are: The overhead gantry structures required for both signing and toll operations; additional ITS network infrastructure such as electrical power, fiber optic cabling and network switches and routers; and signing and pavement striping to convert the operations of the lane fr
- Status
- Closed
- Sector
- Broadband, Power Generation (CCGT), Road, Telecommunications, Government, Manufacturing (Industrial)
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about I-85 NB HOV TO HOT CONVERSION IMPLEMENTATION PROJECT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project represents the roadway portion of the I-85 North HOV to HOT conversion. Included in this GDOT let contract are: The overhead gantry structures required for both signing and toll operations; additional ITS network infrastructure such as electrical power, fiber optic cabling and network switches and routers; and signing and pavement striping to convert the operations of the lane from HOV to HOT. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Broadband, Power Generation (CCGT), Road, Telecommunications, Government, Manufacturing (Industrial) |
Article published date | 2024-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Broadband projects in United States of America
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- MODIFY EXISTING WIRELESS FACILITY, REMOVE (2) TMA'S, INSTALL (1) RRU , REMOVE (2) DIPLEXERS & UTILITY STANDS, REMOVE (2)
- TEMPORARY USE FOR TEMPORARY FACILITY - CELL SITE ON WHEELS (COW) FOR VERIZON WIRELESS - 67-FEET TALL
- DISH WIRELESS WILL BE PERFORMING A 1ST TIME INSTALL AT AN EX ISTING COMM FACILITY. ADDING 3 ANTENNA AND 6 RRU TO TOP OF T
