logo

I-85 SB & NB @CR 296/RIDGEWAY CHURCH RD 3.3 MI N OF COMMERCE

Sector: Bridge • Location: Commerce, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Under Construction

The project consists of the replacement of the I-85 NB and SB bridges over Ridgeway Church Road in Commerce, GA. The new bridges will include two 12-foot lanes, 12-foot outside shoulders and 10 foot inside shoulders along with capacity for a third lane in each direction. The roadway approaches will include two 12-foot lanes in each direction, 14-foot overall outside shoulder with 12-foot paved, a

Project Information FAQ

Project Information

3 Q
The project “I-85 SB & NB @CR 296/RIDGEWAY CHURCH RD 3.3 MI N OF COMMERCE” is an infrastructure initiative in the Bridge sector, located in Commerce, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

under construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project consists of the replacement of the I-85 NB and SB bridges over Ridgeway Church Road in Commerce, GA. The new bridges will include two 12-foot lanes, 12-foot outside shoulders and 10 foot inside shoulders along with capacity for a third lane in each direction. The roadway approaches will include two 12-foot lanes in each direction, 14-foot overall outside shoulder with 12-foot paved, and 12-foot overall inside shoulder with 10-foot paved and 64-foot depressed grass median. Traffic will be staged in the median on a temporary bridge that will alternate NB & SB traffic during each respective bridge reconstruction. The proposed project length is 0.7 miles. This project will be Let with 0015245, which adds a third lane NB&SB to I-85 in this corridor. Project to be Let in June 2021.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data