logo
ProjectClosed

I-90 Snowshed to Keechelus Dam Phase 1C

Closed · Washington

Source: Clark Construction

I-90 Snoqualmie Pass project widens the highway from two to three lanes in each direction at the 3,022 foot summit of Snoqualmie Pass through the Cascade Mountain range. The scope of work includes straightening three miles of roadway to eliminate several unsafe curves and constructing an 1,100-foot bridge over the lakeshore, a 170,000-square-foot mechanically-stabilized earth wall, and 4,600 linea

Status
Closed
Sector
Bridge, Hydro, Road, Government, Water Supply and Storage, Waste Processing and Treatment
Location
Hyak, Washington, United States of America
Updated
22 Jul 2026
Source
Clark Construction

ConstructChat

Ask ConstructChat about I-90 Snowshed to Keechelus Dam Phase 1C

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “I-90 Snowshed to Keechelus Dam Phase 1C” is an infrastructure initiative in the Bridge sector, located in Hyak, Washington, United States of America. Taiyo aggregates data on it from Clark Construction.

Participants

Sponsoring Agency

Company

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

I-90 Snoqualmie Pass project widens the highway from two to three lanes in each direction at the 3,022 foot summit of Snoqualmie Pass through the Cascade Mountain range. The scope of work includes straightening three miles of roadway to eliminate several unsafe curves and constructing an 1,100-foot bridge over the lakeshore, a 170,000-square-foot mechanically-stabilized earth wall, and 4,600 linear feet of drainage. Awards 2020 ENR Northwest Best Project Award (Highway/Bridge) 2020 ACEC Washington Award of Excellence (Platinum)

Location

Country

United States of America (USA)

State

Washington

City

Hyak

Source

Source reliability

High

Source

Clark Construction

URL

More Details

Record type

Project

Sector

Bridge, Hydro, Road, Government, Water Supply and Storage, Waste Processing and Treatment

Article published date

2023-08-30

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project