I-93 Improvements Salem to Manchester Project
Sector: Road • Location: New Hampshire, United States of America
Source: Build America Bureau (BAB) Projects
The Project will reconstruct 19.8 miles of Interstate 93 and widen the interstate from two to four lanes in each direction from Manchester, NH at the I-93/I-293 interchange to Salem, NH at the New Hampshire / Massachusetts state line. In addition, the Project will reconstruct and reconfigure interchanges, complete work on bridges, and construct park-and-ride lots and bus facilities. The Project is
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | credit agreement executed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Project will reconstruct 19.8 miles of Interstate 93 and widen the interstate from two to four lanes in each direction from Manchester, NH at the I-93/I-293 interchange to Salem, NH at the New Hampshire / Massachusetts state line. In addition, the Project will reconstruct and reconfigure interchanges, complete work on bridges, and construct park-and-ride lots and bus facilities. The Project is being carried out by the State of New Hampshire acting by and through the New Hampshire Department of Transportation (NHDOT). The State has long designated the Project as its number one priority transportation improvement project. According to NHDOT, this project is one of the most ambitious projects ever undertaken in the State and is needed to reduce congestion and improve safety. The original section of the highway was built in the early 1960s to accommodate 60,000 to 70,000 vehicles per day. In 1997, average traffic volumes were in excess of 100,000 vehicles per day in Salem, with segments between interchanges carrying up to 80,000 vehicles per day, causing congestion in the region. The Project is being constructed in eight discrete segments and NHDOT will utilize the TIFIA loan to advance the construction of the remaining elements of the Mainline Construction – Capacity Improvements. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
