logo

I-93 Improvements Salem to Manchester Project

Sector: Road • Location: New Hampshire, United States of America

Source: Build America Bureau (BAB) Projects

Project
Credit Agreement Executed

The Project will reconstruct 19.8 miles of Interstate 93 and widen the interstate from two to four lanes in each direction from Manchester, NH at the I-93/I-293 interchange to Salem, NH at the New Hampshire / Massachusetts state line. In addition, the Project will reconstruct and reconfigure interchanges, complete work on bridges, and construct park-and-ride lots and bus facilities. The Project is

Project Information FAQ

Project Information

5 Q
The project “I-93 Improvements Salem to Manchester Project” is an infrastructure initiative in the Road sector, located in New Hampshire, United States of America. Taiyo aggregates data on it from Build America Bureau (BAB) Projects.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

credit agreement executed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Project will reconstruct 19.8 miles of Interstate 93 and widen the interstate from two to four lanes in each direction from Manchester, NH at the I-93/I-293 interchange to Salem, NH at the New Hampshire / Massachusetts state line. In addition, the Project will reconstruct and reconfigure interchanges, complete work on bridges, and construct park-and-ride lots and bus facilities. The Project is being carried out by the State of New Hampshire acting by and through the New Hampshire Department of Transportation (NHDOT). The State has long designated the Project as its number one priority transportation improvement project. According to NHDOT, this project is one of the most ambitious projects ever undertaken in the State and is needed to reduce congestion and improve safety. The original section of the highway was built in the early 1960s to accommodate 60,000 to 70,000 vehicles per day. In 1997, average traffic volumes were in excess of 100,000 vehicles per day in Salem, with segments between interchanges carrying up to 80,000 vehicles per day, causing congestion in the region. The Project is being constructed in eight discrete segments and NHDOT will utilize the TIFIA loan to advance the construction of the remaining elements of the Mainline Construction – Capacity Improvements.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data