I-94 Bridge Repair and Closure Project in Minneapolis
Sector: Bridge • Location: Minneapolis, Minnesota, United States
Source: Patch
A major stretch of Interstate 94 in Minneapolis will fully close in both directions between I-35W and Huron Boulevard from June 13 to June 16, 2025, for bridge repair work on eastbound I-94. The project aims to result in smoother, safer driving surfaces on five bridges along I-94, with lane reductions continuing through mid-August and final work extending into fall 2025.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Under Construction |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | A major stretch of Interstate 94 in Minneapolis will fully close in both directions between I-35W and Huron Boulevard from June 13 to June 16, 2025, for bridge repair work on eastbound I-94. The project aims to result in smoother, safer driving surfaces on five bridges along I-94, with lane reductions continuing through mid-August and final work extending into fall 2025. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
