logo
ProjectActive

I-94 Interchange (Exit 182) Sterling

Sector: Raw Materials • Location: Sterling, North Dakota, United States of America

Source: North Dakota Department of Transportation (NDDOT)

The Sterling Interchange is a key intersection for rural and agricultural traffic traveling along Interstate 94, U.S. Highway 83, and North Dakota Highway 14. This bridge reconstruction project will address the deteriorating conditions of the overhead bridge that crosses I-94. The project involves removing the existing four-span bridge and reconstructing a new 48-foot-wide, two-span bridge with im

Status
Prospective
Sector
Raw Materials, Road, Bridge, Government
Location
Sterling, North Dakota, United States of America
Updated
19 Nov 2026
Source
North Dakota Department of Transportation (NDDOT)

ConstructChat

Ask ConstructChat about I-94 Interchange (Exit 182) Sterling

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “I-94 Interchange (Exit 182) Sterling” is an infrastructure initiative in the Raw Materials sector, located in Sterling, North Dakota, United States of America. Taiyo aggregates data on it from North Dakota Department of Transportation (NDDOT).

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The Sterling Interchange is a key intersection for rural and agricultural traffic traveling along Interstate 94, U.S. Highway 83, and North Dakota Highway 14. This bridge reconstruction project will address the deteriorating conditions of the overhead bridge that crosses I-94. The project involves removing the existing four-span bridge and reconstructing a new 48-foot-wide, two-span bridge with improved design features. Additionally, the north and south bridge approach roadways will be re-graded and resurfaced, and new guardrails will be installed. Portions of the interchange ramps and 30th Avenue Northeast frontage road will also be re-graded and resurfaced to accommodate the new bridge. During construction, traffic control measures will be in place to maintain traffic flow and detour routes will be provided for northbound and southbound traffic.

Location

Country

United States of America (USA)

State

North Dakota

City

Sterling

Source

Source

North Dakota Department of Transportation (NDDOT)

URL

More Details

Record type

Project

Sector

Raw Materials, Road, Bridge, Government

Article published date

2024-10-31

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project