logo

I-95 from S.R. 207 to International Golf Parkway resurfacing

Sector: Road • Location: St. Augustine, Florida, United States of America

Source: Florida Department of Transportation (FDOT)

Project
Active

The Florida Department of Transportation began a twelve mile resurfacing project on I-95 from State Road 207 to International Golf Parkway in early October 2021. During the project, crews will mill and resurface the existing three-lane northbound and southbound roadway of I-95 from State Road 207 to International Golf Parkway, including the interstate entry and exit ramps at State Road 207 and Sta

Project Information FAQ

Project Information

5 Q
The project “I-95 from S.R. 207 to International Golf Parkway resurfacing” is an infrastructure initiative in the Road sector, located in St. Augustine, Florida, United States of America. Taiyo aggregates data on it from Florida Department of Transportation (FDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Florida Department of Transportation began a twelve mile resurfacing project on I-95 from State Road 207 to International Golf Parkway in early October 2021. During the project, crews will mill and resurface the existing three-lane northbound and southbound roadway of I-95 from State Road 207 to International Golf Parkway, including the interstate entry and exit ramps at State Road 207 and State Road 16. Improvements will also include construction of a Median U-Turn Intersection along State Road 16 at the I-95 Interchange. This new interchange concept has been widely utilized in other parts of the United States, however it will be the first full Median U-Turn intersection constructed in the State of Florida. Drivers approaching a Median U-Turn intersection who desire to turn left will be routed straight through the intersection and diverted to a one way median opening located several hundred feet from the main intersection. This configuration will eliminate left-turning movements from the main intersection and reduced signal cycle times, which will result in increased safety and overall shorter travel times. Other improvements will include 6-laning of State Road 16 through the interchange, milling and resurfacing and pier protection along State Road 207, and upgrades to signalization, roadway lighting and the Intelligence Transportation Systems (ITS) throughout the project limits. Temporary lane closures will be permitted on Sunday through Thursday nights from 8 p.m. to 6 a.m. Anderson Columbia was selected to complete both improvement projects.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data